Yesterday I finally got of my lazy but and did some restoration work on the house. I have been working on the stairway since last summer very, very slowly. So far I have repaired the walls, stripped and stained the windows plus the chair rails and trim, and stripped one of the two platforms on the stairs. Yesterday I pulled up most of the remaining carpet and 50 year old padding, pulled out all of the nails and staples, and did most of the taping need to start stripping the majority of the stairs. Once I finally get these stripped, stained, and pollied I can finally paint those walls. Then the only thing left to do on the main floor will be the kitchen and adding the bathroom. Both of these have to wait until I get the roof repaired though – that should happen this spring.
Thursday, September 22, 2005
Back to the Stairs
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment